A logistics plan can look solid until one weak point puts the entire schedule at risk. Find it before shipment starts

What we review

The logistics plan as one connected system

We analyse the route, timeline, cargo readiness, documentation, customs arrangements, venue requirements and available backup options. The point is not to inspect each item in isolation, but to see how one constraint can affect the next stage of the movement.

Route & timing

01

Collection

Is the cargo ready before the transport cutoff?
02

Transfer / handover

Is there enough time between transport stages?
03

Border / customs

Can the planned procedure fit the available time?
04

Venue slot

Does arrival align with access and unloading conditions?

Cargo readiness

Specifications, packaging and readiness are checked against the proposed logistics solution.

Documents & customs

Documentation and the planned customs procedure are checked for inconsistencies and timing risk.

Venue requirements

Access, delivery windows and unloading requirements are checked against the planned arrival.

Backup options

Time buffer and realistic alternatives are considered where the original plan has little room to recover.
Why this matters
The highest-risk points are often the handovers: changing transport modes, crossing a border, meeting a fixed delivery slot or unloading under venue restrictions. The review checks whether the plan leaves enough time and enough options at those points.
How risks develop

A small issue at one stage can create problems several steps later

Logistics risks rarely exist in isolation. These examples show the kind of cause-and-effect chain the review is intended to expose before cargo starts moving
DOCUMENTATION
Cause
Cargo information does not match across documents
Immediate risk
Additional customs checks are required
Logistics effect
Clearance takes longer than planned
Project effect
The delivery window comes under pressure
TIMING
Cause
The route has very little contingency time
Immediate risk
A flight, transfer or border crossing is delayed
Logistics effect
The next connection becomes difficult to meet
Project effect
Remaining recovery time disappears
VENUE
Cause
Access or unloading requirements are not confirmed
Immediate risk
The planned arrival does not fit venue conditions
Logistics effect
Delivery or unloading has to be adjusted
Project effect
Available installation time is reduced
Crew securing event lighting equipment in flight cases beside a loading truck
Scope of the review

What the service may include

The exact scope depends on the project
Route & timeline

Reviewing the route and assessing whether the proposed timeline is realistic.

Customs

Reviewing customs documents and the planned customs procedure.

Cargo suitability

Checking whether the cargo specifications are suitable for the proposed logistics solution.

Venue access

Checking venue access requirements and the delivery window.

Time buffer & alternatives

Assessing the available time buffer and alternative options.

Not sure where the weak point is?

Send us the route, event date and cargo details. We will identify the areas that need closer review.
Selected Cases

Real constraints
Real operating decisions

Examples of projects where venue access, routing, cargo characteristics and fixed deadlines shaped the logistics plan
Concert, Equipment Rental
Eurovision stage inside the Turin arena before the show
Eurovision 2022

Eurovision Mission: Logistics Despite  the War

Emergency evacuation of specialist camera equipment from blockaded Kyiv to Turin during the war.
30 tonnes delivered in 6–7 days, without delays or damage.
Sport
Starladder Budapest Major esports arena during the live tournament
Budapest Major 2025

39 Vehicles, One Operating Schedule

Large trucks couldn't reach central Budapest venues, requiring a precisely coordinated local delivery operation
39 smaller vehicles coordinated under one delivery schedule
Production
Industrial robot being prepared among transport cases
CES 2020

Transporting a 2.4-Tonne Robot to CES

Special packaging and routing for an industrial robotic arm with an offset centre of gravity
Delivered to Las Vegas on time and without damage
Sport
Formula race car on the Baku city circuit
Formula 1 Baku

Anti-Crisis Logistics to Baku

Equipment consolidated from the Netherlands, Germany and Poland
10 vehicles coordinated; on schedule and within budget
FAQ
What information do you need to start a Logistics Risk Review?

Send us the route, event date and cargo details. This gives us the initial information needed to identify the project's key logistics risk points.

What parts of the logistics plan can you review?

Depending on the project, the review may cover the proposed route and timeline, cargo readiness, documentation, customs arrangements, venue requirements, delivery windows, available time buffers and alternative options.

Do you review customs arrangements?

Yes. The review may include customs documentation and the planned customs procedure, including whether they fit the proposed route and timeline.

Can you review venue access and delivery requirements?

Yes. Venue access requirements, delivery windows and unloading conditions can be reviewed against the planned arrival and overall logistics schedule.

Do you assess backup options if something goes wrong?

The review can assess the available time buffer and realistic alternative options, particularly at stages where the project has limited room to recover from a delay.

Can you check whether the cargo suits the proposed logistics solution?

Yes. Cargo specifications can be checked against the proposed transport and handling solution to identify potential issues before the shipment begins.