Sport
2025

39 Vehicles, One Operating Schedule

L4E managed logistics for Budapest Major 2025, a major esports event in Budapest. We coordinated international shipments, warehousing, documents, local deliveries and transport operations at the venues.

The project required precise timing, rapid decisions onsite and close coordination between numerous participants. Local delivery in central Budapest presented a particular challenge, as large lorries could not physically reach the venues. We therefore organised deliveries using 39 smaller vehicles, each with a carefully scheduled arrival time.

PROJECT SNAPSHOT
Client
StarLadder — international esports event and live-production organiser
Event
Budapest Major 2025
Location
Budapest, Hungary
Cargo
Event cargo, broadcast equipment, servers, computers, filming equipment, staging, sound and lighting equipment, screens, set elements, special-effects equipment, merchandise and partner materials
Transport
International road transport, air freight, container shipments and smaller vehicles for local deliveries
Result
The equipment was delivered according to schedule, while the logistics remained under control at every stage.
Project Type
Large-scale esports logistics
Services
Transport planning, documentation, customs procedures, ATA Carnet support, warehouse logistics, local delivery and coordination between drivers, contractors and venues
Main Challenge
Coordinating a large volume of event cargo, 39 smaller vehicles, the warehouse, drivers, venues and contractors within a single schedule. At peak times, vehicles arrived for unloading approximately every 15 minutes and could not be allowed to build up outside the venues.
This is a basic text element.
THE CLIENT

Behind a Major International Esports Event

StarLadder organises international esports events and live productions. Budapest Major 2025 required equipment for broadcasting, staging, technical areas, partner activations and contractor operations.

In projects of this scale, logistics directly affects event preparations. Cargo must arrive not simply in the right city, but in the correct order, at the right place and at the precise time required.

THE CHALLENGE

When Large Trucks Can't Reach the Venue

The main challenge was local delivery in Budapest. Large lorries could not operate directly outside the venues because of narrow streets, tourist traffic, limited stopping areas and unloading zones that were physically inaccessible to large vehicles.

Warehouse operations presented another challenge. Cargo arrived from different countries and from numerous contractors and sponsors. The timing of some deliveries could not be predicted precisely. The team needed to receive shipments quickly, allocate them to the correct venues and continuously update the delivery schedule.

OUR SOLUTION

39 Vehicles. One Coordinated Logistics System

We developed an integrated logistics plan covering international transport, warehousing, documentation, local routes and vehicle arrival schedules.

Instead of sending large lorries directly to the venues, we arranged deliveries using 39 smaller vehicles. Each vehicle was assigned a specific time for arrival, unloading and departure. We had to monitor almost every vehicle closely, as even an unplanned stop for coffee or lunch could disrupt the entire schedule. This helped prevent queues, traffic congestion and blocked access to the venues.

The warehouse operated as a logistics hub. We received and checked the cargo, allocated it to the relevant venues and planned the loading sequence. Whenever new shipments arrived from sponsors or partners, the team updated the plan immediately.

An L4E representative worked onsite, coordinating the drivers, warehouse, client, venues and contractors. This allowed us to respond quickly to changes and avoid losing time at critical moments.

International transport → Budapest warehouse → scheduled venue deliveries
THE RESULT

Every Delivery in Sequence. Every Venue on Schedule

The project was completed on time. All key cargo was delivered to the correct venues, in the right sequence and according to the event preparation schedule.

Despite the complex city logistics, the number of vehicles involved, unpredictable cargo arrival times and tight schedule, the entire process remained under control. The client received more than transport: they had a clear and coordinated logistics system.

39
Smaller Delivery Vehicles Coordinated
≈15 min
Vehicle Arrival Intervals at Peak Times
On Schedule
Key Cargo Delivered in the Required Sequence
Client feedback

This was one of your best projects. Having your representative onsite to coordinate everything made a significant difference.

Client representative

According to the client, other contractors were also impressed by how precisely the process had been organised. At major events, vehicle arrivals, waiting times, unloading and finding the right person onsite can easily become chaotic. On this project, every participant knew when to arrive, where to go, who would meet them and how unloading would be managed.

WHAT THIS DEMONSTRATES

Logistics Is More Than Moving Cargo

Budapest Major 2025 demonstrates L4E’s ability to manage complex event logistics involving large volumes of cargo, numerous vehicles and contractors, and frequent operational changes.

For projects of this kind, transport is only one part of the process. The key is to build a complete logistics system: analyse the risks, plan the work of the team and contractors, develop detailed routes, coordinate warehouse operations, prepare the documents, establish firm deadlines, create a precise schedule, plan the timing of local deliveries and provide onsite coordination.

For the client, this means that even the complex logistics behind a major international event can remain controlled and manageable.

If you are planning an international show, esports tournament, exhibition or large-scale live production, do not put your deadlines at risk. The L4E team can manage the entire process, from complex customs procedures to the coordination of each vehicle at the venue.

Contact us to discuss the most suitable solution for your budget and schedule.

START YOUR PROJECT

Planning an event, exhibition or tour?

L4E will provide reliable logistics for your project, from the first stage of planning to the final delivery of cargo anywhere in the world.
MORE CASE STUDIES

See how we solve other logistics challenges

Explore more real-world projects involving complex routes, customs requirements and time-critical delivery.
Concert, Equipment Rental
Eurovision stage inside the Turin arena before the show
Eurovision 2022

Eurovision Mission: Logistics Despite  the War

Emergency evacuation of specialist camera equipment from blockaded Kyiv to Turin during the war.
30 tonnes delivered in 6–7 days, without delays or damage.
Sport
Starladder Budapest Major esports arena during the live tournament
Budapest Major 2025

39 Vehicles, One Operating Schedule

Large trucks couldn't reach central Budapest venues, requiring a precisely coordinated local delivery operation
39 smaller vehicles coordinated under one delivery schedule
Production
Industrial robot being prepared among transport cases
CES 2020

Transporting a 2.4-Tonne Robot to CES

Special packaging and routing for an industrial robotic arm with an offset centre of gravity
Delivered to Las Vegas on time and without damage
Sport
Formula race car on the Baku city circuit
Formula 1 Baku

Anti-Crisis Logistics to Baku

Equipment consolidated from the Netherlands, Germany and Poland
10 vehicles coordinated; on schedule and within budget